Projects

Current Projects

New High Ridge Water Tower Project

The scope of work includes: construction of a new 500,000-gallon multi-leg elevated water storage tank, including foundations, tank erection, interior piping and tank painting.  The scope of work also includes the demolition and removal of the existing 40,000 gallon stand pipe and general site work.

  • Projected Construction Start:                         August 2018
  • Projected Construction Completion:             June 2019

Completed Projects

Pottery Road Water Main Improvement Project (Phase 3) – Completed: October 2018

The scope of work included: construction of approximately 2,400 lineal feet of new 8-inch PVC water main, fire hydrants, system connections, service transfers and other incidental items along a portion of Pottery Road. The water main was relocated away from the road, in anticipation of future road upgrades.

Pottery Road Water Main Improvement Project (Phase 2) – Project Completed: June 2018

The scope of work included: construction of approximately 2,700 lineal feet of new 8-inch PVC water main to replace existing smaller, aging pipe along a portion of Pottery Road. The water main was relocated away from the road, in anticipation of future road upgrades.

Pottery Road Water Main Improvements – Project Completed: September 2017

The scope of work included: construction of approximately 1,300 lineal feet of new 6-inch PVC water main to replace existing smaller, aging pipe. Water main replacement occurred along a portion of Pottery Road and was relocated away from the road, to allow for roadwork upgrades.

Highway A Water Main Relocation – Project Completed: November 2014

In conjunction with the Missouri Department of Transportation’s Route A Safety Improvement Project, the District completed relocating and improving water mains along Highway A and portions of (North) Country Club Road. Construction of the District’s upgrades began in June 2014, prior to MoDOT’s roadway improvements.